Friday, July 27, 2012

Summer 2012 - Septic System


I decided the next big project would be to get the septic system in the ground and out of the way.  One of the many goals for this year is to get some grass planted.  The best place for a nice patch of grass is of course the same location as the septic.

Approx 8ft. by 12 ft. by 8 ft. deep hole for 1250 gallon tank.

The first big load on the bridge.  Since then we have had fully loaded gravel trucks and a nearly full concrete truck.  No signs of stress on the bridge, so that's good.
Tank and drain field in. See back ground, I guess I do not have a better picture of the garden







90 feet of drain pipe, 6 ft. of gravel below pipe.

No comments:

Post a Comment