Summer 2012 - Bunkhouse Slab

The next step on the barn (other wise known as the Cabarn) is to enclose the sleeping area.  Kevin came down from SLC and helped me hand dig footings, install a layer of visqueen (plastic), leveled the base, installed #4 rebar in the footings and a #3 rebar mat.






Under slab plumbing for the bathroom and kitchenette.











Brian came up form St. George and helped me pour the slab.