The concrete was previously stained, now rolling on the sealer.
Placing the road base material for the ramps. In the future I will cover the base with a more decorative fractured rock. I don't think the word decorative is used very often in the farming community.
With the front ramp compete, we can now perform the first drive on test of the bridge and complete the back ramp.
Installing the curbs. I decided to use treated 2x6 vs 6x6 so that the curbs would follow the curve or camber of the bridge.
Cleaning up the bevelled ends.
It's the best looking bridge in Kanosh for sure!
ReplyDelete